ENLIGHTENED POST

Explore, Engage, Enlighten

Rs 300 cr spent on drains, Gurugram to now use parks to check flooding

After spending more than Rs 300 crore on drainage and stormwater projects over three years, Gurugram is turning to its parks and open spaces to tackle recurring monsoon flooding. The Haryana government has directed the Gurugram Metropolitan Development Authority (GMDA) and the Haryana State Industrial and Infrastructure Development Corporation (HSIIDC) to develop water bodies and retention ponds across 247 acres of city parks before the next monsoon.

The plan marks a shift from relying primarily on drains to carrying away rainwater towards retaining it within the city. The proposed parks will include rainwater harvesting structures to store stormwater and recharge groundwater, reducing the volume of water flowing into residential areas and streets.

The directions were issued by DS Dhesi, Principal Adviser to the Haryana government for urban development, at a review meeting on Wednesday. He said parks should incorporate sustainable water management alongside landscaping to improve the city’s ability to withstand monsoon waterlogging.

The need for an alternative approach became evident during this year’s monsoon. The Municipal Corporation of Gurugram (MCG) monitored 155 waterlogging hotspots around the clock. On one occasion, nearly 97 mm of rainfall in a single day left large parts of the city waterlogged for a second consecutive day, prompting a work-from-home advisory.

The city’s drainage problems are also linked to the loss of natural water channels. A 2022 state government survey found that Gurugram had lost nearly 75% of its natural stormwater drains amid real estate development following the previous master plan.

Officials believe restoring some of this natural water-retention capacity through parks could provide a more economical and environmentally sustainable buffer than constructing additional pipes and drainage channels.

The success of the initiative will depend on how effectively the proposed retention ponds and rainwater harvesting structures are implemented before the next monsoon, particularly in areas that repeatedly experience flooding.

Source: The Tribune

Leave a Comment

Your email address will not be published. Required fields are marked *

Search Here

Follow Us

Recent Posts